Skip to content
Home » PGE Narodowy Bypass

PGE Narodowy Bypass

The Saskers company, due to its experience and resources, was selected for the difficult task of installing a rope bypass in the structure of the PGE National Stadium.
As a result of detecting a defect in one of the steel rope connectors - elements supporting the spire of PGE Narodowy - the facility was closed to visitors. A special bypass to relieve the structure, imported from Italy, weighs 6 tons and has been installed 45 meters above the stadium's surface. It will allow you to repair the damaged part of the roof.

Material from TVN Warszawa available in the link: (The National Stadium is reopening. Not all spaces will be available to guests)
Stadion Narodowy wznawia działalność. Nie wszystkie przestrzenie będą dostępne dla gości > > >

See full photo gallery of bypass installation by Saskers:

en_GB